Bikefill Community Bike Park

Share Bikefill Community Bike Park on Facebook Share Bikefill Community Bike Park on Twitter Share Bikefill Community Bike Park on Linkedin Email Bikefill Community Bike Park link

The City of Bozeman Parks and Recreation Department, Gallatin Valley Land Trust (GVLT), and Southwest Montana Mountain Bike Association (SWMMBA) are seeking feedback during the development of the Bikefill Community Bike Park Master Plan.

Bikefill Community Bike Park is a project that aims to not only fill needed gaps in the cycling infrastructure of the Gallatin Valley, but also provide the community with an easy accessible, world-class bike park experience for users of all ages and abilities through various trail types and styles.

The City of Bozeman Parks and Recreation Department, Gallatin Valley Land Trust (GVLT), and Southwest Montana Mountain Bike Association (SWMMBA) are seeking feedback during the development of the Bikefill Community Bike Park Master Plan.

Bikefill Community Bike Park is a project that aims to not only fill needed gaps in the cycling infrastructure of the Gallatin Valley, but also provide the community with an easy accessible, world-class bike park experience for users of all ages and abilities through various trail types and styles.

  • Draft Parks Master Plan Available

    Share Draft Parks Master Plan Available on Facebook Share Draft Parks Master Plan Available on Twitter Share Draft Parks Master Plan Available on Linkedin Email Draft Parks Master Plan Available link

    The Bikefill Community Bike Park project excited to release the draft Parks Master Plan for the facility which incorporates the public input presented at the Urban Parks and Foresty meeting on February 26. The draft Master Plan aims to address the design and management goals of the facility built based on the public input received in order to provide the wide variety of bicycle specific trails and features that will fill a much-needed void in Bozeman recreation infrastructure, all while honoring, preserving, and enhancing the natural environment of the Bikefill site.

    The Urban Parks and Forestry Board will review the plan and make their recommendation to the City Commission for approval, or approval with edits, at their meeting on March 26 at 6:00pm at City Hall. The draft Parks Master plan is available, along with associated conceptual trail map, schematic design and renderings of the parking lot and primary civil elements of the park. Public input on the draft plan can be submitted by email at comments@bozeman.net (please submit by noon on March 26) or in person during the public comment period of the meeting. City Commission will make their final decision at their meeting on April 7 at 6:00pm at City Hall.

    Check out the Bikefill Parks Master Plan March 2026 folder located in the Documents section of this page for the Parks Master Plan and Appendices:


  • Engagement Presentation at Urban Parks & Forestry Board

    Share Engagement Presentation at Urban Parks & Forestry Board on Facebook Share Engagement Presentation at Urban Parks & Forestry Board on Twitter Share Engagement Presentation at Urban Parks & Forestry Board on Linkedin Email Engagement Presentation at Urban Parks & Forestry Board link

    In case you missed it, we presented on Bikefill Public Engagement at the February 26 Urban Parks & Forestry Board. Listen to the recording (19:58) and check out the Public Engagement Outcomes Presentation saved in the Documents Section.


  • Bikefill Engagement Report

    Share Bikefill Engagement Report on Facebook Share Bikefill Engagement Report on Twitter Share Bikefill Engagement Report on Linkedin Email Bikefill Engagement Report link

    We are pleased to release CRO Planning’s thorough analysis of data collected during the public comment period for Bikefill. In general, the data shows that respondents are excited for a wide variety of bicycle specific trails and features that will fill a much needed void in Bozeman recreation infrastructure, all while honoring, preserving, and enhancing the natural environment of the Bikefill site.

    Check out the engagement reports in the Bikefill Documents section.

  • Local Design and Construction Team Selected

    Share Local Design and Construction Team Selected on Facebook Share Local Design and Construction Team Selected on Twitter Share Local Design and Construction Team Selected on Linkedin Email Local Design and Construction Team Selected link

    This fall, a highly skilled, locally based design and construction team was selected to bring the Bikefill vision to life. The team is a collaboration of two leading Montana trail design and construction firms:

    • Integrated Trail Lab: A locally owned and Bozeman-based firm known for projects including the Westlake Dirt Jumps, pump tracks at Gallatin Regional Park and Copper City, and the Big Sky Community Park asphalt pump track.
    • Terraflow: A Whitefish-based firm known for the recently completed Gnomadic Trail at Crosscut/Bridger, NeverSweat at Copper City, Mountain to Meadow in Big Sky, and the acclaimed Legacy Bike Park in Lakeside, Montana.


    Integrated Trails Lab and Terraflow are supported by: