Bikefill Community Bike Park
The City of Bozeman Parks and Recreation Department, Gallatin Valley Land Trust (GVLT), and Southwest Montana Mountain Bike Association (SWMMBA) are seeking feedback during the development of the Bikefill Community Bike Park Master Plan.
Bikefill Community Bike Park is a project that aims to not only fill needed gaps in the cycling infrastructure of the Gallatin Valley, but also provide the community with an easy accessible, world-class bike park experience for users of all ages and abilities through various trail types and styles.
The City of Bozeman Parks and Recreation Department, Gallatin Valley Land Trust (GVLT), and Southwest Montana Mountain Bike Association (SWMMBA) are seeking feedback during the development of the Bikefill Community Bike Park Master Plan.
Bikefill Community Bike Park is a project that aims to not only fill needed gaps in the cycling infrastructure of the Gallatin Valley, but also provide the community with an easy accessible, world-class bike park experience for users of all ages and abilities through various trail types and styles.
-
Draft Parks Master Plan Available
Share Draft Parks Master Plan Available on Facebook Share Draft Parks Master Plan Available on Twitter Share Draft Parks Master Plan Available on Linkedin Email Draft Parks Master Plan Available linkThe Bikefill Community Bike Park project excited to release the draft Parks Master Plan for the facility which incorporates the public input presented at the Urban Parks and Foresty meeting on February 26. The draft Master Plan aims to address the design and management goals of the facility built based on the public input received in order to provide the wide variety of bicycle specific trails and features that will fill a much-needed void in Bozeman recreation infrastructure, all while honoring, preserving, and enhancing the natural environment of the Bikefill site.
The Urban Parks and Forestry Board will review the plan and make their recommendation to the City Commission for approval, or approval with edits, at their meeting on March 26 at 6:00pm at City Hall. The draft Parks Master plan is available, along with associated conceptual trail map, schematic design and renderings of the parking lot and primary civil elements of the park. Public input on the draft plan can be submitted by email at comments@bozeman.net (please submit by noon on March 26) or in person during the public comment period of the meeting. City Commission will make their final decision at their meeting on April 7 at 6:00pm at City Hall.
Check out the Bikefill Parks Master Plan March 2026 folder located in the Documents section of this page for the Parks Master Plan and Appendices:
- Parks Master Plan
- Overall Trail Map
- Overall Site Master Plan
- Overall Site Master Plan and Amenity Callouts
- Family Hub Master Plan
- Family Hub Master Plan and Amenity Callouts
- Wetland Delineation Summary
- Public Engagement Technical Report
-
Engagement Presentation at Urban Parks & Forestry Board
Share Engagement Presentation at Urban Parks & Forestry Board on Facebook Share Engagement Presentation at Urban Parks & Forestry Board on Twitter Share Engagement Presentation at Urban Parks & Forestry Board on Linkedin Email Engagement Presentation at Urban Parks & Forestry Board linkIn case you missed it, we presented on Bikefill Public Engagement at the February 26 Urban Parks & Forestry Board. Listen to the recording (19:58) and check out the Public Engagement Outcomes Presentation saved in the Documents Section.
-
Bikefill Engagement Report
Share Bikefill Engagement Report on Facebook Share Bikefill Engagement Report on Twitter Share Bikefill Engagement Report on Linkedin Email Bikefill Engagement Report linkWe are pleased to release CRO Planning’s thorough analysis of data collected during the public comment period for Bikefill. In general, the data shows that respondents are excited for a wide variety of bicycle specific trails and features that will fill a much needed void in Bozeman recreation infrastructure, all while honoring, preserving, and enhancing the natural environment of the Bikefill site.
Check out the engagement reports in the Bikefill Documents section.
-
Local Design and Construction Team Selected
Share Local Design and Construction Team Selected on Facebook Share Local Design and Construction Team Selected on Twitter Share Local Design and Construction Team Selected on Linkedin Email Local Design and Construction Team Selected link

This fall, a highly skilled, locally based design and construction team was selected to bring the Bikefill vision to life. The team is a collaboration of two leading Montana trail design and construction firms:
- Integrated Trail Lab: A locally owned and Bozeman-based firm known for projects including the Westlake Dirt Jumps, pump tracks at Gallatin Regional Park and Copper City, and the Big Sky Community Park asphalt pump track.
- Terraflow: A Whitefish-based firm known for the recently completed Gnomadic Trail at Crosscut/Bridger, NeverSweat at Copper City, Mountain to Meadow in Big Sky, and the acclaimed Legacy Bike Park in Lakeside, Montana.
Integrated Trails Lab and Terraflow are supported by:
- CRO Planning and Design
- Design 5 Landscape Architecture
- Aspekt Architecture and Design
- Sanbell Engineering
Follow Project
Gallatin Valley Land Trust
Key Dates
-
April 07 2026
-
March 26 2026
-
January 15 2026
-
January 14 2026
-
January 06 2026
Timeline
-
Prior to November 2025
Bikefill Community Bike Park has finished this stage- Fundraising Goals Met including grants, City of Bozeman capital planning, and over 800 individual donors
- Introduce the project via partner channels, preliminary site analysis, and site visits with stakeholders.
-
November-January
Bikefill Community Bike Park has finished this stageConsult with community members and partners in the development of the Park Master Plan.
-
January - February
Bikefill Community Bike Park is currently at this stageSummarize engagement and develop draft design concepts.
-
Spring 2026
this is an upcoming stage for Bikefill Community Bike ParkCommission Adoption of Park Master Plan
-
Summer 2026
this is an upcoming stage for Bikefill Community Bike ParkGroundbreaking
Who's Listening
-
Parks Planning and Development Manager
AJEmail ajadin@bozeman.net -
AJ
Email adam@gvlt.org
Bikefill Documents
-
Bikefill Parks Master Plan March 2026
-
Bikefill Parks Master Plan (4.79 MB) (pdf)
-
Overall Trail Map Appendix A (20.9 MB) (pdf)
-
Overall Site Plan Appendix B (1.38 MB) (pdf)
-
Overall Site Master Plan-Amenity Callouts Appendix C (1.78 MB) (pdf)
-
Family Hub Master Plan Appendix D (1.38 MB) (pdf)
-
Family Hub Master Plan-Amenity Callouts Appendix E (2.33 MB) (pdf)
-
Wetland Delineation Summary Appendix F (1.82 MB) (pdf)
-
Public Engagement Technical Report Appendix G (7.84 MB) (pdf)
-
-
Bikefill MOU-GVLT and SWMMBA.pdf (2.93 MB) (pdf)
-
Bikefill Public Engagement Technical Report (7.84 MB) (pdf)
-
Bikefill Survey Overall Summary (400 KB) (pdf)
-
Bikefill Survey User Profiles (1.94 MB) (pdf)
-
Bikefill Public Engagement Outcomes (8.56 MB) (pdf)